Output needed to increase due to production demands.
|
|
New high speed presses installed to increase output and capacity.
|
|
Output did not increase as expected and equipment OEM called in.
|
|
OEM determined incorrect machine set-ups were causing excessive downtime.
|
|
OEM training did not improve situation due to complexity of machines. |
The OEM recommended use of Red Oak Knowledge Systems.
|
|
Red Oak worked with OEM technicians to document complex set-up procedures.
|
|
Procedures developed using multi-media and Red Oak’s patented step-graphic approach.
|
|
Operators re-trained using new methods and system.
|
|
Procedures available at machine 24/7. |
Consistency in machine set-up across all shifts.
|
|
Set-up related downtime reduced by 98%.
|
|
Production output increased 48%.
|
|
OEM hired Red Oak to develop system for worldwide use.
|